Apa-25 CNC Metal Press Tube Hole Punching Machines

Product Details
Customization: Available
Warranty: 12 Months
Feature: Automation, High Efficiency, Precision

360° Virtual Tour

Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
8
Year of Establishment
2011-03-15
  • Apa-25 CNC Metal Press Tube Hole Punching Machines
Find Similar Products

Basic Info.

Model NO.
APA-25
Customized
Customized
Condition
New
Slide Adjustment
50 mm
Model
V, H, S
Nominal Force (Kn)
15000
Key Selling Points
High-Accuracy
Motor Power (Kw)
3.7 Kw
Return Force (Kn)
15000 Kn
Slide Stroke (mm)
50mm
Rated Tonnage Point
3.2, 1.6, 3.2mm
Stable Speed
110 S.P.M
System
Servo
Video Outgoing-Inspection
Provided
Stroke
70, 30, 80 mm
Slide Height
195, 215, 195mm
Core Components
Bearing, Gear, PLC
Shank Hole
38.1 mm
Certification
ISO9001, CE
Specification
1280*850*2200 mm
Trademark
AOMATE
Origin
Zhejiang, China
Production Capacity
500 Set/Sets Per Year

Product Description

APA-25 CNC Metal Press Tube Hole Punching Machines

Product Description
Apa-25 CNC Metal Press Tube Hole Punching Machines
Specification
Machine model
APA-25
Main motor (kw.p)
3.7*4
Slide adjust device (hp)
manual operation
Air pressure (kg/cm2)
6
Presses precision
GB/JIS 1 CLASS
Presses dimension (mm)
1280*850*2200
Presses weight (ton)
2.1
 

Company Profile
Apa-25 CNC Metal Press Tube Hole Punching Machines
Apa-25 CNC Metal Press Tube Hole Punching Machines
NINGBO BEILUN ALLWAY MACHINERY Co., Ltd is located in Hailong Industry Park Development Zone (Beilun), Ningbo, China, which is attached to Hailong Group. Our company is found in 1995, cover dozens of more than 80, 000m2 production base and has a professional technology engineer team who has been long engaged in design and manufacturing each type of machine flexibly. Besides, our company owns advanced CAM manufacturing and production facilities, and the whole process from material, parts, assembly and testing instruments is in accordance with ISO quality guarantee system. The engineering technology center has achieved modern management of CAD simulation optimization design. PDM design process management and ERP operation system.
Our company has got both 1st level energy conservation certification, ISO 9001-2008 certifacation & CE authentication for Injection molding machine (90-3000T), Die casting machine(Hot chamber 30-200T, Cold chamber 140-2000T, MG 140-2000T), Press punch machine (15-1000T). The OEM base of some Japan, Italy, Spain brand machines. Besides We have cooperation with European partner, to design our machine with innovation and perfection together, so as to bring more our European style machines to the market.
Group main products: "WELLISH" DIE CASTING MACHINE "AOTAI"INJECTION MOLDING MACHINE "AOMATE"PRESS PUNCH MACHINE

Certifications
Apa-25 CNC Metal Press Tube Hole Punching Machines
Apa-25 CNC Metal Press Tube Hole Punching Machines
Apa-25 CNC Metal Press Tube Hole Punching MachinesProduction Process
Apa-25 CNC Metal Press Tube Hole Punching Machines
Apa-25 CNC Metal Press Tube Hole Punching MachinesExhibition
Apa-25 CNC Metal Press Tube Hole Punching Machines
Apa-25 CNC Metal Press Tube Hole Punching MachinesPacking & Delivery
Apa-25 CNC Metal Press Tube Hole Punching Machines
Apa-25 CNC Metal Press Tube Hole Punching MachinesFAQ
1. What kind of plastic material can be used on this machine?
PP, PE, PS, ABS and other general material could be used on this machine.
If you have other special material such as PC, PMMA, PVC, please contact us for further information.
2. What is guarantee time for this machine?
12 months after installation or 18 months again B/L date.

3. What kind of shipping container for this machine?
Containere choose will depends on the different machine size . 20HQ,40HQ,40GP will suitable for different size machine.

4. How much is Engineer service charge?
We can send experienced technician to customer's country for guiding the installation and commission the machine, also train the
customer's employee. Customer need to afford technician visa charge, round trip air ticket expense, accommodation and
transportation in local. Also customer needs to pay USD 80 per days to technician as salary.

5. How long will be for installation and commission this machine?
If customer prepare all necessary thing such as power supply, water supply, hydraulic oil, plastic material, plastic mold,
installation and commission period will be within 7days including training customer's employee.

6. How many workers are needed to operate this machine?
One worker only.

7. What is the power consumption for this machine?
Power consumption is determined by the product. Different product requests different power consumption.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier